Artisan Technology Group Quest 210 Specifications

Browse online or download Specifications for Synthesizer Artisan Technology Group Quest 210. Artisan Technology Group Quest 210 Specifications User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 38
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Artisan Technology Group is your source for quality
new and certied-used/pre-owned equipment
FAST SHIPPING AND
DELIVERY
TENS OF THOUSANDS OF
IN-STOCK ITEMS
EQUIPMENT DEMOS
HUNDREDS OF
MANUFACTURERS
SUPPORTED
LEASING/MONTHLY
RENTALS
ITAR CERTIFIED
SECURE ASSET SOLUTIONS
SERVICE CENTER REPAIRS
Experienced engineers and technicians on staff
at our full-service, in-house repair center
WE BUY USED EQUIPMENT
Sell your excess, underutilized, and idle used equipment
We also offer credit for buy-backs and trade-ins
www.artisantg.com/WeBuyEquipment
REMOTE INSPECTION
Remotely inspect equipment before purchasing with
our interactive website at www.instraview.com
LOOKING FOR MORE INFORMATION?
Visit us on the web at www.artisantg.com for more
information on price quotations, drivers, technical
specications, manuals, and documentation
Contact us: (888) 88-SOURCE | sales@artisantg.com | www.artisantg.com
SM
View
Instra
Page view 0
1 2 3 4 5 6 ... 37 38

Summary of Contents

Page 1 -

Artisan Technology Group is your source for quality new and certied-used/pre-owned equipment• FAST SHIPPING AND DELIVERY• TENS OF THOUSANDS OF IN-S

Page 2

Figure 5. Using the RV mount as a fulcrum, twist the RV to "break it free" from the Lower Drain Manifold male RV fitting and "twist-up

Page 3 - Total amount used

Figure 7. Remove the RV from the holder With your fingers, remove the RV from the Reactor Unit (Figure 7) Using a sharp pair of scissors, cut the top

Page 4

RV Installation Slide ten 5 mL RVs between the aluminum heating plate and spring loaded insulators on the Reactor Unit. Press them down over the male

Page 5

4. Check that the vessels are fully seated over the male Teflon RV fittings of the Lower Drain Manifold. If the vesseIs are seated properly, the tops

Page 6

Figure 11. Quest Controller Unit display Place a single magnet mixer into each RV with the fin facing downward. Use the external hand magnet found in

Page 7 - (Figure

Tm both Manifold Control Valves to "CLOSED" Drain Gas Metered Gas Solvent Closed Vent @- Closed Utility 1 Utility 2 Unscrew the Solvent B

Page 8

2. Close the Upper Manifold by first turning the left Manifold Control Valve to "CLOSED", then turn the right Manifold Control Valve to &q

Page 9 - Number 1022%

Press the Right or Left soft keys (',) to select the % Upward parameter (the amount of time the agitation bar remains in the up most position exp

Page 10 - Quest Tutorial

Raise the handle so the Lower Manifold Drain Valves are closed. Add -4 mL DCM to the RVs by turning the Manifold Control Valves to "SOLVENT"

Page 11 - Part Number 102298

8. Move the agitator up by pressing the Agitation UP soft key located to the right of the Quest Controller Unit display. 9. Turn the Manifold Control

Page 12 - Number 102298

ARGONAUT TECHNOLOGIES Quest 21 0: User Tutorial R'OH or Et SLEt H PS-DES A (6equiv I R' R~ 7 mol% RhCI(PPh3)3 NMP (3 mL), 60°C, 3 h (1 50 mg

Page 13

H. Addition of Reagent Under Nitrogen to the Reaction Vessels 1. Adjust the Metered Gas Needle Valve located on the top of the Quest Reactor Unit unti

Page 14

On the Quest Controller Unit press the MODE soft key located below the LCD display until the Agitation menu is displayed. Set parameters as follows:

Page 15 - Tutorial

9. The heaters will shut off when the timer runs out and the RVs will begin cooling to ambient temperature. ----------------- A (ON) B (OFF) SET 60.0

Page 16 - (?&)

h. Install the bottle cap assembly onto the 4L bottle of NMP. Ensure the Teflon bottle seal is placed in the bottleneck and tighten the bottle cap.

Page 17

111. CleavageIScavenger of the Resin and Product Collection Cleavage solution (0.4 M HFIPyridine in THF, 4 mL) is added to the washed resin using a sy

Page 18

Turn the agitation on by pushing the Agitation ON soft key located to the right side of the Quest Controller Unit display. If solvent is splashing up

Page 19 - "VENT"

bottom of the Lower Manifold. The silver buttons will snap out to verify that the collection tray is locked into position. 5. Ensure that each Teflon

Page 20 - 7/64"

c. On the Quest Controller Unit press the MODE soft key located below the LCD display until the Agitation menu is displayed. Set the agitation parame

Page 21 - (T&)

1V. Cleaning the Quest (Maintenance) and Sample Work UpIAnalysis To ensure the Quest 2 10 is ready for the next synthesis it is recommended to flush t

Page 22

B. Sample Work Up 1. Using a Savant SpeedVac (Model SS620DDA SpeedVac or equivalent), evaporate the solvent from the 20 mL scintillation vials contain

Page 23 - "DRAIN

pGolidinemethanol 1 -na~hthaleneethanol I Aldrich I FW 172.23 1 206 mg Material ArgoCaps (PS-DES) Wilkinson's catalyst Chlorotris(triphenylphosph

Page 24

C. IR and GC Product Analysis Infrared Analysis Infrared spectra were recorded on a Nicolet Impact 41 0 spectrometer equipped with an InspectIR micros

Page 25 - (Methoxytrimethylsilane)

ame~r~usue~~o~ Figure 16. PS-DES Infrared Spectra Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.

Page 26

agUey1WSUEJ 1 % Figure 17. PS-DES-OR Infrared Spectra Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisa

Page 27 - Part Number 102298

Sorred Ey Xrrltiplier Dilution Totals : Figure 18.-Ana2p5is of I-(2-methoxybenzoyl)-2-pyrr~lidinemethanol Artisan Technology Group - Quality Instrumen

Page 28 - Flushing the System

Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

Page 29 - PS-DES resin

=========----======================================-----============= Injection Dzte : 1/22/98 8 :21:53 PM Seq. Line : 13 Sample Nane .. Vial : 98 A-c

Page 30 - Figures

Vial- : 99 Fisure 21. Analysis of pia and roster one Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisa

Page 31 - Infrared

Figure 22. Analysis of 4-biph~nvlmethanol Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

Page 32

Artisan Technology Group is your source for quality new and certied-used/pre-owned equipment• FAST SHIPPING AND DELIVERY• TENS OF THOUSANDS OF IN-S

Page 33 - Dilution

polycarbonate capsules (ArgoCaps) are placed into the RVs and washed three times with 4 mL of dichloromethane (DCM). The efficient removal of the ca

Page 34

I AlcohollCarbonyl AlcohoVCarbonyl Structure Amount 1 1 -naphthaleneethanol 206 mgl 4 rnL NMP 2.2-diphenylethanol Ph 238 mgl ho H 4 rnL NMP Ph 218

Page 35 - DIETP~~~~

Drain I Figure 2. Quest 210 Reactor Unit Installation of an Oil Bubbler and Purging the System - This synthesis requires an oil bubbler be installed i

Page 36 - Analysis

Figure 3. Location of Manifold Controls and Utility Ports Once the oil bubbler is installed, ensure that it is functioning properly by doing th

Page 37 - 4-biph~nvlmethanol

using the white Teflon Drain Lever provided with the Quest to drain all I0 RVs in parallel. Drain Gas Metered Gas Utility 1 Utility 2 Leaving the Low

Page 38

D. RV Removal & Instrument Cleaning 1. To remove the RVs from Side A (RVs 1-10) use the following protocol. a. Position the rotating lever on th

Comments to this Manuals

No comments