Artisan Technology Group Quest 210 Specifications Page 21

  • Download
  • Add to my manuals
  • Print
  • Page
    / 42
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 20
Gas
Delivery
Manifold
1.
Connect one end of the Gas Delivery Manifold line (Part number
300794)
to
the outlet of the GRCM control box. Connect the other end to the inlet port
of the Gas Delivery Manifold. Install a plug on the other outlet of the GRCM
Control Box if it is not being used.
2.
Push in the two buttons on the waste tray handles and lower the waste tray.
3.
Remove the waste container and set
it
aside.
4.
Select the side of the Quest reactor which you will be using.
5.
Align the female hers of the Gas Delivery Manifold with the male luers of
the reaction vessel outlets.
6.
Gently push the Gas Delivery Manifold onto the male luers until it is held in
place.
7.
Raise the waste tray to lock the Gas Delivery Manifold
in
place.
Figure
4
below shows a schematic of the Quest Lower Manifold with the
Gas Delivery Manifold:
A
separated and
B
installed.
GRCM
-
User
Manual
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Page view 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 41 42

Comments to this Manuals

No comments