Artisan Technology Group Quest 210 Specifications Page 22

  • Download
  • Add to my manuals
  • Print
  • Page
    / 42
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 21
GRCM
INSTALLATION
'
Installation
Steps
.
A
Quest Lower Manifold
with Gas Delivery Manifold in the
Waste
Tray
Lower
Gas
Rail
Lev
UP
aste
aY
B
Quest Lower Manifold
with
Gas
Delivery Manifold Installed
Figure
4:
Gas Delivery Manifold and the Quest Lower Manifold
Solvent Trap Manifold
The installation of this component
is
required for concentration
by
evaporation.
1.
Remove the her plugs from the upper manifold of the reaction bank which
you will be using.
2.
Align the male fittings of the Solvent Trap Manifold with the upper manifold
ports.
3.
Gently push down on the Solvent Trap Manifold to seat it onto the upper
manifold.
4.
Connect one end of the
%
inch TygonB tubing (Part number
103954)
to the
barbed outlet fitting of the Solvent Trap Manifold. Connect the other end to
the user-supplied vapor trap.
GRCM
-
User
Manual
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Page view 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 41 42

Comments to this Manuals

No comments