Artisan Technology Group Quest 210 Specifications Page 54

  • Download
  • Add to my manuals
  • Print
  • Page
    / 98
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 53
Installing New Reaction Vessels
Waste Tray and Container
The Quest is equipped with a rectangular glass container for waste collection. The glass
waste container is equipped with a plug valve which can be used to drain the tank to a
waste drum. Also, a hose may be attached to the valve and the end placed in a larger
waste container. Install the glass waste container under the Reactor Unit. This container
can be removed for product collection.
Place the glass waste container the Waste Tray. Next, via buttons on its handle, move
the tray to its upper notch position, and lock the container in place just below the
reaction block. The tray can be lowered, via buttons on its handles, for removal or
installation of the waste container.
WARNING
The waste tray will be heavy when full of solvent. Lower the tray
carefully.
QUEST
210
User
Manual
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Page view 53
1 2 ... 49 50 51 52 53 54 55 56 57 58 59 ... 97 98

Comments to this Manuals

No comments