Artisan Technology Group Quest 210 Specifications Page 19

  • Download
  • Add to my manuals
  • Print
  • Page
    / 98
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 18
Introduction
Quest Installation Procedure
Quest Installation Procedure
Installation of the Quest involves connecting the system to a gas source, and making
some simple tubing connections. The process should take less than
1
hour.
Parts
-
Quest Reactor Unit
Quest Controller Unit
Umbilicus (Shipped with one end connected to the Quest Reactor Unit)
Starter Kit
Glass Waste Tank
Solvent Bottle Cap
Safety Carrier for
4L
Solvent Bottle
Installation Glossary
-
Teflon Tubing
-
The semi-transparent tubing
(118
"
OD)
used for gas and liquid connec-
tions. Semi-rigid.
Tygon Tubing
-
This flexible tubing has a slight yellow color to it. Used for gas
connections within the Quest controller unit.
Bushing
-
The tan colored threaded fittings (PEEK) used for Teflon tubing connections.
Ferrule
-
The yellow, conical shaped piece which mates to the PEEK bushings. Used
for Teflon tube connections.
Bulk Head Fitting
-
The female threaded ports found on the front of the Quest
Controller, and on various places of the Quest Reaction Unit.
Umbilicus
-
The bundle of tubing and electrical wires which connects the Quest
Controller to the Quest Reaction Unit.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Page view 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 97 98

Comments to this Manuals

No comments