Artisan Technology Group Quest 210 Specifications Page 26

  • Download
  • Add to my manuals
  • Print
  • Page
    / 98
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 25
Connect the Reactor Unit Manifold Tubes
Figure 1-7 Quest Upper Reactor Assembly
Install the three tubes on one side of the Quest Reactor Unit:
Screw in the bushing for one end of the tube labeled "Mem. Press." to th
le upper red
h
~ulk
head fitting on the upper Reactor Assembly labeled "Manifold." Screw the other end
of the tube into the female threaded port on the Upper Manifold located at the top of the
"triangle of ports (see diagram previous page)."
Screw in the bushing for one end of the tube labeled "Man. Vent" to the red bulk head
fitting located on the upper Reactor Assembly under the port labeled "Manifold." This
will be the upper port of a set of
2
mounted together. Screw the other end of the tube
into the female threaded port on the Upper Manifold at in the middle of the "triangle of
ports (see diagram previous page)."
QUEST
210
User
Manual
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Page view 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 97 98

Comments to this Manuals

No comments